Plans, reports and roll plots
These documents are public resources and can be shared with individuals upon request by emailing 495northernextension@vdot.virginia.gov and requesting the file by name.
Please note the files have not all been converted to be “ADA Compliant.” You may request assistance with documents by contacting michelle.holland@vdot.virginia.gov or 495northernextension@vdot.virginia.gov.
| Document |
|---|
| 495 NEXT Revegetation Plan – June 2025 (PDF, 38.0MB) |
| 495 NEXT Revegetation Plan: Supplemental Exhibits of Seed Mixes and Plant Materials - April 2025 (PDF, 9.6MB) |
| 495 NEXT Final Construction Plans: Area 1, South of Existing Express Lanes to the Dulles Corridor Interchange - December 2022 (PDF, 64.6MB) |
| 495 NEXT Final Construction Plans: Area 2, Dulles Corridor Interchange to Old Dominion Drive - December 2022 (PDF, 71.2MB) |
| 495 NEXT Final Construction Plans: Area 3, Old Dominion Drive to Live Oak Drive - December 2022 (PDF, 162.1MB) |
| 495 NEXT Final Construction Plans: Area 4, Live Oak Drive to the George Washington Memorial Parkway - December 2022 (PDF, 113.8MB) |
| 495 NEXT Project Wide Post-Development Storm Water Management Outfall Roll Plot - May 2022 (PDF, 27.7MB) |
| 495 NEXT Project Wide Pre-Development Storm Water Management Outfall Roll Plot - May 2022 (PDF, 21.9MB) |
| 495 NEXT Stormwater Management Roll Plot - May 2022 (PDF, 39.72MB) |
| 495 NEXT Minimum Standards 19 Report - April 2022 (PDF, 287.4MB) |
| 495 NEXT Preliminary Project Concept for Live Oak Drive Area - March 2022 (3.3MB) |
| 495 NEXT Study Location and Design Public Hearing Boards - October 2020 (PDF, 9.7MB) |
| 495 NEXT Request for Proposal Design Plans - February 2020 (PDF, 51.9MB) |
| 495 NEXT Study Location and Design Public Hearing Right of Way-Limited Access Lines Boards - March 2020 (PDF, 5.3MB) |
| 495 NEXT Study Location and Design Public Hearing Proposed Noise Barrier Layout Roll Plots - March 2020 (PDF, 6.2MB) |
Last updated: March 31, 2026
